Quanhui Modular Housing
Logistics & Installation

Delivery & Site Preparation Guide

From factory crating to the final utility connection on your land: a clear walkthrough of the delivery and setup sequence.

Phase 1: Logistics

Factory to Port Freight

Each Quanhui 20ft Modular Home is inspected, weather-sealed in heavy shrink wrap, and packed into an intermodal container configuration. We coordinate container vessel booking, ocean freight, customs filing, and port terminal clearance.

Phase 2: Road Transit

Domestic Flatbed Delivery

From the port of arrival, your home is loaded onto a standard commercial flatbed or step-deck trailer and transported directly to your parcel. Ensure access roads have at least 12 feet of vertical clearance and no impassable low-hanging trees.

Phase 3: Rigging

Crane / Forklift Placement

A local mobile crane or heavy-duty forklift lifts the folded chassis from the flatbed trailer and sets it onto your pre-leveled foundation piers. Corner castings provide standard ISO rigging points for quick lifting.

Phase 4: Assembly

2-Hour Expansion & Tie-In

The side wings unfold outward on heavy mechanical hinges. The floor panels drop into level position, end wall panels swing into place, and perimeter compression gaskets are secured. Plug in utilities and move in.

Foundation Requirements

Expandable homes do not require complex, expensive continuous basement foundations. The perimeter requires stable support at corner points and intermediate wing leveling blocks: